Jim Miller Design
  • Home
  • Services
  • Projects
  • Contact
  • Info
  • AECB meetup
  • Blog
Select Page

Shoreham Beach ‘Passivhaus LEB’ | Airtight board

3 April, 2024 | General, Shoreham beach 'Passivhaus'

The twin stud timber external walls to the upper floors are clad internally with an air and vapour tight board and taped to stop air movement, reducing heat loss and safeguarding the building fabric from moisture damage.  Where floor joists run parallel to walls, the boards are taken through the floor void to simplify airtightness detailing (as shown).

Recent Posts

  • AECB Brighton meeting | 6pm Wed 16 December 2026 ALT VENUE!
  • AECB Brighton Group meeting | 6pm Wed 18 November 2026
  • PIONEERING THE POTENTIAL 2026 – LEWES – OCTOBER & NOVEMBER

Categories

  • ‘Passivhaus’ extension
  • AECB | BSBM meeting
  • Airtightness
  • Balfour Road
  • Brighton ‘EnerPHit’ rebuild
  • Brighton low energy renovation
  • Burleigh Court
  • Cold bridging
  • Deep retrofit
  • Edwardian deep retrofit
  • EnerPHit
  • Events
  • Fenestration
  • First Avenue
  • For Sale | surplus
  • General
  • Grants
  • Hove ‘Passivhaus’
  • Inspiration
  • Listed building deep retrofit
  • Listed flat renovation
  • Materials
  • MVHR
  • MVHR maintenance
  • Oxford refurbishment
  • Passiv studio
  • Passivhaus
  • PassivOFFICE case study
  • Planning
  • Queens Place
  • Shoreham beach ‘Passivhaus’
  • Sunday Times Passivhaus
  • Sustainable Renovation
  • Ventilation
  • Victorian ‘EnerPHit’
  • Vine Place
  • York Avenue
+44 (0)1273 233548
jim@jimmillerdesign.co.uk


Please contact us to arrange a consultation.

Policies & Terms

Jim Miller Design Ltd
92 Livingstone Road
Hove
East Sussex
BN3 3WL

 Twitter
 Facebook 
 LinkedIn

    

 

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.