Phase 1 steel (ground floor over) installed in just 1/2 day.

Eagle eyes will spot the heavy bolts to the steel either side of the opening which were required to limit any (live load) deflection in the steel to less than 2mm!

Holes have been pre formed in the concrete walls and the steel for the ventilaiton system.