Woodfibre insulation boards need to be carefully laid out, cut accurately and detailed around windows and are also tongue and groove and so require a surprisingly high level of skill to fit properly, such as provided by a skilled trade such as a carpenter. Woodfibre is much more difficult to fit than EPS which is square edged and gaps can be simply foamed. I would make sure any woodfibre EWI installation uses appropriately skilled trades and don’t assume the regualar EPS system installers can handle a woodfibre job. We also had a bit of a run around with the number of fixings and locations required for the NBT Diffutherm system so worth getting this resolved upfront. As Brighton is Zone 3 for rain and wind, NBT required 6 fixings per board with 3 pe board along any exposed edges. Never did get to the bottom of weather a pull out test was required and who should be making this call. Also consider which fixing is suitable once the substrate is known. Nice to use wood though…
Recent Posts
Categories
- ‘Passivhaus’ extension
- AECB | BSBM meeting
- Airtightness
- Balfour Road
- Brighton ‘EnerPHit’ rebuild
- Brighton low energy renovation
- Burleigh Court
- Cold bridging
- Deep retrofit
- Edwardian deep retrofit
- EnerPHit
- Events
- Fenestration
- First Avenue
- For Sale | surplus
- General
- Grants
- Hove ‘Passivhaus’
- Inspiration
- Listed building deep retrofit
- Listed flat renovation
- Materials
- MVHR
- MVHR maintenance
- Oxford refurbishment
- Passiv studio
- Passivhaus
- PassivOFFICE case study
- Planning
- Queens Place
- Shoreham beach ‘Passivhaus’
- Sunday Times Passivhaus
- Sustainable Renovation
- Ventilation
- Victorian ‘EnerPHit’
- Vine Place
- York Avenue